          電纜橋架安裝準備工作和施工工藝等流程

          我們在山東電纜橋架施工一定會遇到很多問題,接下來給大家總結一下準備工作和施工工藝等流程。
          We will certainly encounter many problems during the construction of cable tray in Shandong. Next, we will summarize the preparatory work and construction process.
          一、準備工作
          1、 Preparation work
          1、熟悉圖紙,與水暖、通風、空調各協調,確定電纜橋架安裝位置及走向,以保證各的管道均能安裝就位,排列布置合理,符合設計及施工規范要求;同時核算橋架及附件、配件的用量。
          1. Be familiar with the drawings, coordinate with the plumbing, ventilation and air conditioning disciplines, and determine the installation position and direction of cable tray to ensure that the pipelines of all disciplines can be installed in place, arranged reasonably, and meet the requirements of design and construction specifications; Simultaneously calculate the usage of cable trays, accessories, and accessories.
          2、安裝電纜橋架使用的主要機具:電工工具、沖擊鉆、手電鉆、臺鉆、高凳、卷尺、鋼鋸、線墜、粉線袋等。
          2. Main machines and tools used for installing cable tray: electrician tools, impact drills, electric hand drills, bench drills, high stools, tape measures, hacksaws, wire pendants, pink wire bags, etc.
          3、為方便安裝施工,保證質量,各種特殊形狀的彎通、非標準件一律現場實測實量,并把外形尺寸及時提供給生產廠家,由生產廠家進行工廠化加工,這樣既能保證工程安裝質量,同時降低了現場工人的生產勞動強度。
          3. For the convenience of installation and construction, and to ensure quality, all special shaped bends and non-standard parts are measured on-site, and the external dimensions are provided to the manufacturer in a timely manner for factory processing. This not only ensures the installation quality of the project, but also reduces the production labor intensity of on-site workers.
          4、橋架內外應光滑平整,無毛刺,無損傷電纜絕緣的凸起和尖角,不應有扭曲、翹邊等變型現象。螺栓、墊圈、彈簧墊等配件均為鍍鋅件。
          4. The inside and outside of the bridge should be smooth and flat, without burrs, protrusions and sharp corners that damage the cable insulation, and there should be no distortion, warping, or other deformation phenomena. Bolts, washers, spring washers, and other accessories are all galvanized parts.
          5、配合土建的結構施工,檢查確認預留洞、預埋鐵的數量位置是否正確,有問題及時處理。
          5. Cooperate with the structural construction of civil engineering, check and confirm whether the quantity and position of reserved holes and embedded iron are correct, and promptly handle any problems.
          二、施工工藝
          2、 Construction process
          1、工藝流程
          1. Process flow
          彈線定位→膨脹螺栓安裝→立柱、吊支架和托臂安裝→電纜橋架安裝→電纜橋架接地
          Snap line for positioning → install expansion bolt → install column, hanger bracket and bracket → install cable tray → ground cable tray
          2、彈線定位
          2. Snap line positioning
          根據設計圖紙確定進出線、盒、箱、柜等電氣器具的安裝位置,從始端終端找好水平線或垂直線,用粉線袋沿墻壁、頂棚等處,沿線路的線彈線;按照設計圖要求及施工驗收規范規定,分勻檔距,并用筆標出具體位置。
          Determine the installation position of electrical appliances such as incoming and outgoing lines, boxes, boxes, cabinets, etc. according to the design drawings, and find horizontal or vertical lines from the beginning to the end. Use a pink line bag to snap lines along the wall, ceiling, etc. along the centerline of the line; According to the design drawings and construction acceptance specifications, divide the span evenly and mark the specific position with a pen.
          3、水平橋架支、吊架、托臂的安裝,豎直橋架的支架安裝方法。
          3. The installation of horizontal bridge supports, hangers, and brackets, as well as the installation method of vertical bridge supports.
          (1)水平橋架(槽式)吊架安裝
          (1) Installation of Horizontal Bridge (Trough) Hanger
          (2)水平橋架(槽式)墻、立柱支架應做成三角支撐型如下
          (2) The horizontal bridge (trough type) wall and column supports should be made into triangular support types as follows
          圖中水平臂與豎直臂等長,焊接為滿焊。靠墻或立柱側應采用不少于兩處膨脹螺栓固定。其各項參數應符合下表:
          The horizontal arm and vertical arm in the figure are of equal length and are fully welded. The side against the wall or column should be fixed with at least two expansion bolts. Its various parameters should comply with the following table:
          (3)豎直橋架(梯式)支架
          (3) Vertical bridge (ladder type) support
          山東電纜橋架
          各項參數應符合下列表格:
          All parameters should comply with the following table:
          4、水平橋架支、吊架、托臂的安裝,豎直橋架的支架安裝要點
          4. The installation of horizontal bridge supports, hangers, and brackets, as well as the installation points of vertical bridge supports
          (1)立柱、吊支架和托臂所用鋼材應平直,無扭曲。下料后長短偏差應在5mm范圍內,切口處應無卷邊、毛刺。
          (1) The steel used for columns, suspension brackets, and support arms should be straight and free from distortion. After cutting, the length deviation should be within 5mm, and there should be no curling or burrs at the incision.
          (2)立柱、吊支架和托臂應安裝牢固,無顯著變形,焊縫均勻平整,焊縫長度應符合要求,不得出現裂紋、咬邊、氣孔、凹陷、漏焊、焊漏等缺陷,焊后應做好防腐處理。
          (2) The columns, suspension brackets, and supporting arms should be installed firmly without significant deformation. The welds should be uniform and flat, and the length of the welds should meet the requirements. There should be no defects such as cracks, undercuts, pores, depressions, missed welds, or welding leaks. After welding, anti-corrosion treatment should be done well.
          (3)立柱、吊支架和托臂的用料規格:嚴格按產品說明及橋架規格要求配置。
          (3) Material specifications for columns, suspension brackets, and support arms: strictly follow the product instructions and bridge specifications for configuration.
          (4)固定支點間距一般不大于1.5m-2.0m。在進出接線盒、箱、柜、轉角、轉彎和變形縫兩端及丁字接頭的三端500mm以內應設置固定支持點。
          (4) The spacing between fixed support points is generally not greater than 1.5m-2.0m. Fixed support points should be set up within 500mm of the two ends of the incoming and outgoing junction boxes, boxes, cabinets, corners, turning and deformation joints, as well as the three ends of the T-joint.
          (5)立柱、吊支架和托臂距離上層樓板不應小于150mm-200mm,距地面高度不應低于100mm-150mm。
          (5) The distance between columns, suspension brackets, and support arms from the upper floor slab should not be less than 150mm-200mm, and the height from the ground should not be less than 100mm-150mm.
          電纜橋架安裝準備工作和施工工藝等流程相關內容就講解到這里了,希望能夠給您好的幫助,更多事項就來我們網站http://www.shfy8.com咨詢吧!
          This is the end of cable tray installation preparation and construction process. I hope I can help you. More information can be found on our website http://www.shfy8.com Consult!
           
          qq
          售前咨詢熱線
          15168870138
          售后咨詢熱線
          13465410318
          主站蜘蛛池模板: 国产最新精品精品视频| 五月开心色婷婷小说网| 日韩区在线观看| 一品在线视频观看| 久久久免费精品RE6| 亚洲国产精品男人的天堂| 国产男女嘿咻视频在线观看| 风骚少妇久久精品在线观看| 四虎成人www成人影视网址 | 一区二区三区在线观看| 国外成年视频网站在线观看| 狠狠色噜噜色狠狠狠综合久久| 久久亚洲日韩看片无码| 国产欧美日韩一区二区三区四区| 激情综合五月丁香亚洲| 欧美不卡在线观看视频| 北条麻妃在线一区二区| 伊人狠狠干| 天天av天天av天天透| 亚洲毛片在线免费| 久久精品中文字幕免费| 五月色婷丁丁香| 99国精品午夜福利视频不卡99| 无码va在线观看| 成全视频在线观看大全腾讯地图| 国产熟女无套中出| 亚洲一本大道在线| 国产成视频永久免费| 狠狠综合久久av一区二| 毛片tv网站无套内射tv网站| 黄网站专区末成年美女| 国产明星xxxx色视频| 精品国产一区二区三区大| 亚洲欧美激情国产综合久久久| 欧美日韩在线一本卡| 亚洲av午夜精品一区二区| 日本另类αv欧美另类aⅴ| 婷婷五月天丁香花| 亚洲精品一区三区三区在| 国产91亚洲| 天堂新版在线资源|